GE Healthcare Division's new 225,000 SF facility for the manufacturing of components for their digital X-Ray and MRI equipment in North Greenbush will feature a dramatic, curved glass and precast concrete entrance anchoring a two story manufacturing structure.
This specialty Office and Class 100 Cleanroom Building is one of the first of its type in the U.S. to be designed as a LEED® Gold project. The building also includes 40,000 SF of Class A office space, a showroom for product display, a café/kitchen, health clinic, fitness center, laboratories, high security lobby/control station, and more.
Precast installation started in September, 2008 and finished in November 2008.
The project featured:
• 52,271 square feet of wall panels
• 63 CarbonCast wall panels (6-inch and 10-inch thick)
• Sun screen columns
• Wall panels in heights ranging up to 37 feet and featuring two levels of sandblast (light and heavy).
General Electric
Location:
Year:
Owner:
Architect:
Engineer:
General Contractor:
Project Scope
Sq. Footage:
40,000 (Office - Class A)
Levels/Floors:
Structural Precast Elements:
• 63 CarbonCast wall panels (6-inch and 10-inch thick)
• Sunscreen columns
• Wall panels in heights ranging up to 37 ft